What percentage of General Contractors have experienced a construction claim or dispute in the last 5 years?

Service Solution Spotlight | Neutral CCA® For In-House Counsel

If you are in the 83% of General Contractors who have experienced a claim or dispute in the last five years, you’re familiar with the pain that comes with litigation.  To alleviate stress associated with litigation, Proactive has pioneered the Neutral CCA®  process.  Proactive gets to the bottom of project delays, by acting as a neutral investigative party -- finding the root causes of delay, disruption and cost overruns. This process fixes the traditionally-broken process of claim resolution -- where the involvement of multiple advocates makes balanced, accurate assessments of project claims difficult and contentious.  

 

Neutral Collaborative Claims Analysis for In-House Counsel is the powerful alternative to traditional claims management.

 

Download Full News Flash



Featured Case Study

This is an extremely powerful tool.  This could be used on a regular basis for subs who aren't performing.

Proactive was recently tasked with providing multifaceted assistance on an apartment complex project, where the wood framing subcontractor defaulted.

 

The project consisted of two, four-story apartment buildings, both with wood frame structures. After the default occurred, Proactive was hired to help facilitate the recovery process.

 

To do so, Proactive provided second-set-of-eyes (SSOE) schedule reviews and 2D look ahead graphics.  Through the SSOE schedule review process, Proactive determined that the schedules did not include activities, or the necessary logic, to capture any  deficiency or corrective work being performed on site.

 

The contractor’s Corporate Scheduler used the 2D look ahead graphics as a communication tool to encourage the project team to follow through with recommendations provided by Proactive.  Proactive also provided Neutral Delay Analysis services.

 

Proactive’s services were so well received by the project team, the Senior Project Manager stated, “I’m very impressed with the process. You guys are very thorough.”


What’s New at Proactive

Proactive is hiring!

 

If you want to join a team of the most talented practitioners and visionaries who are changing the construction industry through technology-advanced collaborative services, Proactive is for you. Proactive is looking for a Project Consultant to review and analyze construction claims.

 

The candidate should have 0-3 years of construction experience.

 

If you are interesting in learning more about the position, please reach out to Erin Camp at [email protected]

 


Meet the Team | Keith Kelly

Keith has over 30 years of experience in the construction industry providing innovative solutions in project controls, scheduling, claims and BIM. He is responsible for overseeing Proactive's project control assignments and ensuring project solutions are tailored to each of our clients' needs

 

The industry is not very collaborative, and often litigious. Our most 'innovative' service is our collaborative approach to claims resolution

Keith is a graduate of New York Institute of Technology and works out of Cary, NC.

 

Want to learn more about the rest of the Proactive team? Click here.

Main Offices

Boston
351 Pleasant Street, Suite B, #135
Northampton, MA 01060
  216.220.2740

Raleigh
1859 Evans Road
Cary, NC 27513
  216.220.2740

Cleveland
P.O. Box 16824
Rocky River, OH 44116
  216.220.2740